Some work in the Prow now. The strips of brass come in a coil and take some work to straighten out to the correct curve before cutting and gluing in place.
Figurehead in place as well



The transoms are not a success story.

The top buts fitted well and the top transom appears to be in the right position

The test was the two large cherubs either side. They had to fit snugly into the shields and feet touching the railing.


But the lower transom is about 3mm two close to the one above. I will wait until I collect in August the joining pillars to see how far it out exactly is but in my heart I think I will have to cut it off and do it again so I will order a replacement issue.