Received work pack 6 - mainly continuing the fwd engine bay, some interior items and the shoulder belts....
1st I repacked the bonnet as the 4 small latches kept faillng out - Ive kept them in with the bonnet in a plastic bag till needed toward the end of the build

Then got into the latest assemblies from pack 18





Next was pack 19 - interior stuff, fuel lines fire ext. etc..